HEAD OFFICE: TOKYO BLDG., 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPANAuthorized representative in EU: MITSUBISHI ELECTRIC EUROPE B.V. HARMA
10A B CEDM1M2M1M2M1M2STB7TB3IC(51)M1 M2 12STB5TB1512TB1512TB1512TB1512TB1512TB15MA(01)ICM1 M2 STB5(02)ICM1 M2 STB5(04)ICM1 M2 STB5(03)ICM1 M2 ST
11GB1.1. Before installation and electric worku Before installing the unit, make sure you read all the “Safety precautions”.u The “Safety precautio
12GB1.4. Before installation (relocation) - electrical work Caution:Ground the unit.• - Do not connect the ground wire to gas or water pipes, lightni
13GB3. Combination of outdoor unitsComponent units of PUHY-P500 to P1250 are listed below.Outdoor unit model Component unit modelPUHY-P200YJM-A(-BS)
14GB6. Space required around unit1 In case of single installationSecure enough space around the unit as shown in the gure on page 2.• [Fig. 6.0.1]
15GB8.1. Installation[Fig. 8.1.1] (P.3)<A> Without detachable leg <B> With detachable legAM10 anchor bolt procured at the site.BCorner i
16GBTo the outdoor unitCAPTo the outdoor unit10. Additional refrigerant chargeAt the time of shipping, the outdoor unit is charged with refrigerant.Th
17GB Caution:Place a wet towel on the refrigerant service valve before heating the brazed • section to keep the temperature of the valve from exceedin
18GB[Fig. 10.2.3] (P.7)A Example of closure materials (eld supply)B Fill the gap at the siteMake sure to seal-off the space around areas where the
19GB11.1. Caution1 Follow ordinance of your governmental organization for technical standard related to electrical equipment, wiring regulations and
2 (mm)6[Fig. 6.0.1](2)(1)(3)[Fig. 6.0.2]<A> : Top view <B> : Side view<C> : When there is little space up to an obstruction A : Fro
20GB2 Wiring examplesController name, symbol and allowable number of controllers.• Name Code Possible unit connectionsOutdoor unitMain unit OC – (*2)
21GBRemote controller cable length: • 1, 2 10 m (0.3 to 1.25 mm2) If the length exceeds 10 m, use 1.25 mm2 shielded cable and calculate the le
22GB12. Test run12.1. The following phenomena do not represent faults.Phenomenon Display of remote controller CauseIndoor unit does not perform coolin
23GBModel P1250YSJM-A EP200YJM-A EP250YJM-A EP300YJM-AUnit combination P450 P450 P350 - - -Refrigerant (R410A) 11.8kg 11.8kg 11.5kg 8.0kg 11.5kg 11.8k
Please be sure to put the contact address/telephone number on this manual before handing it to the customer.HEAD OFFICE: TOKYO BLDG., 2-7-3, MARUNOUC
3[Fig. 7.0.1]1 P200 ~ P300 EP2008m8m4078[Fig. 8.1.1]<A> Without detachable legA : M10 anchor bolt procured at the site.B : Corner is not sea
499.2[Fig. 9.2.1][P200 ~ P450][EP200, EP250, EP300]A : Outdoor unitB : First branchC : Indoor unitD : CapE : Outdoor twinning kit[P500 ~ P900][EP
5A (mm)9.29*1 ø12.7 for over 90m*2 ø12.7 for over 40m*3 The pipe sizes listed in columns A1 to A3 in this table correspond to the sizes for the m
69.29[Fig. 9.2.2]ACFBCF<A> Make sure the pipes from the twinning pipe to the outdoor unit are sloped downwards (towards the twinning pipes).FC2m
710.210[Fig. 10.2.1] [Fig. 10.2.3]ABA : Exampleofclosurematerials(eldsupply)B : Fill the gap at the site[Fig. 10.2.2]<A> Front pipe rout
8[Fig. 10.3.1][Fig. 10.3.3][Fig. 10.3.2]10.3AA : Nitrogen gasB : To indoor unitC : System analyzerD : Low knobE : Hi knobF : ValveG : Liquid pi
9CL1 L2 L3 NTerminal block for indoor – outdoor transmission line(TB3)Terminal block for centralized control(TB7)Power supply terminal block(TB1)Contr