Commissioning Checklist
81
FTC-4 Installation Manual
Customer Name
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*
Is the primary circuit a sealed or open vented system?
Customer Name
Commissioning Date
Building Regulations Notification No. (if applicaable)
Commissioned By
(print name)
Reg Operative ID No.
Tel No.
Cylinder Make & Model
Cylinder Serial No.
Address
Company Address
Customer Name
Commissioning Engineers Signature Customer’s Signature (to confirm satisfactory demonstration and receipt of manufacturer’s literature)
ALL SYSTEMS PRIMARY SETTINGS
Tick the appropriate boxes if applicable(indirect heating only)
1
What is the maximum primary flow temperature?
Open
Sealed
2
°C
What store temperature is achievable ?
THERMAL STORES ONLY
Tick the appropriate boxes if applicable
1
What is the maximum hot water temperature ?
2
°C
°C
What is the incoming static cold water pressure at the inlet to the system?
ALL SYSTEMS
Tick the appropriate boxes if applicable
1
Has a strainer been cleaned on installation debris (if fitted) ?
No
2
Is the installation in a hard water area (above 200ppm) ?
3
If Yes, has a water scale reducer been fitted ?
4
What type of scale reducer has been fitted ?
5
What is the hot water thermostat set temperature ?
6
What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet) ?
7
Time and temperature controls have been fitted in compliance with Part L of the Building Regulations?
8
Type of control system (if applicable)
°C
l/min
°C
9
Is the cylinder solar (or other renewable) compatible ?
10
What is the hot water temparature at the nearest outlet ?
11
All appropriate pipes have been insulated up to 1 metre or the point where they become concealed
12
Where is the pressure reducing valve situated (if fitted) ?
UNVENTED SYSTEMS ONLY
Tick the appropriate boxes if applicable
1
What is the pressure reducing valve setting ?
2
Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested ?
Yes
No
No
3
The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations
Yes
Yes
No
Yes
4
Are all energy sources fitted with a cut out device ?
5
Has the expansion vessel or internal air space been checked ?
6
The hot water system complies with the appropriate Building Regulations
ALL INSTALLATIONS
Tick the appropriate boxes if applicable
1
The system has been installed and commissioned in acordance with the manufacturer’s instructions
2
The system controls have been demonstrted to and unstood by the customer
3
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
4
bar
Yes
No
Yes
No
Yes
Yes
Yes
No
Yes
Other
Y Plan S Plan
bar
Yes
Yes
Yes
Yes
Mains Pressure Hot Water Storage System
This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of demonstrating compliance with the
appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturers
instructions may invalidate the warranty but does not affect your statutory rights.
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.
A Building Regulations Compliance Certificate will the be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
www. centralheating.co.uk
Vue de la page 80
1 2 ... 76 77 78 79 80 81 82 83 84

Commentaires sur ces manuels

Pas de commentaire